Do you want to receive an email when news items are posted?
Many thanks to everyone who took the time to respond in detail to the roads and infrastructure proposals shared between January and February 2023. There were 488 Commonplace contributions and 59 agreements with these contributions, giving a total of 547 contributions. 114 feedback emails were also sent directly to the Weybridge project email address.
All these responses have been analysed anda summary of the feedback can be read on the roads and consultation feedback tile.
Detailed design is currently underway and the feedback received during the consultation will inform the updated designs. Construction works are planned to commence in late summer to early autumn 2023.